Ready Now
John Deere 1050K
REQUESTING BIDS・ LISTED: 10/14/2026 5:26 PM・ LOAD # 2501241


A. Length21 ft 11 in
B. Width9 ft 6 in
C. Height11 ft 5 in
D. Attachment17 ft 0 in
Weight100,000 lbs
Item is Operable: Yes
Starts and moves under its own power: Yes
Item/Stock #:15786920
Serial #:
PO #:15786920
Additional Details:
Located in Lane 0 Spot 1, Enclosed Cab, Air Conditioner, 2016 US EPA Label, CARB Compliant, Requires Diesel Exhaust Fluid, Engine Coolant Heater, Positive Air Shutoff, Fast Fuel System, 204 in Wide Angle Blade w/ Dual Tilt, 4 Cylinder Single-Shank Ripper w/Hydraulic Pin Puller, Rear Auxiliary Hydraulics, 28 in Single Grouser Track Shoes
Location
Pickup Site
Grande Prairie AB T8X 4G1 CAReady to Load: 10/15/2026 8:00 AM
No loading dockNo loading assistance
Dropoff Site
Surrey BC V4N 3X5 CADeliver By: 10/22/2026 8:00 AM
No loading dockNo loading assistance
Load Advisor
Item Type: Crawler Tractors
Shipper Verified
Machine has a Single Shank Ripper attached.
Shipper has NOT VERIFIED item's dimensions.
Disassembly is an option but not a requirement. Service providers who want disassembly need to include that in their bid with an explanation.
Shipper VERIFIED that item starts and moves under its own power.
Compliance
Permit required for width.
2 escort/pilot vehicles required.
Recommended Trailers
Beam or Rail Trailer
Lowboy or RGN
Lowboy Drop Rail or Exposed Center Beam
Questions & Answers
Question: I assume you'll have the blade pulled off, as 17ft wide would be insanely costly - could you send me the weight of the blade, as well as the width to the outside of the c-frame ( although you may want to pull that off too). Chat soon, Nick
trying to get actual blade dimensions an estimated weight. I doubt that it's 17', maybe 13'. We will have blade removed as needed. what is the transport limit?
Transport limit before pilot cars is 11ft 6, but we'll already need one for length anyways - so let me know what you can find out for width of the blade and I'll talk to my heavy haul team about a price.
204" is in write up so its 17'. i will try to confirm. We will have to get it removed. i'm in surrey so haven't seen machine in person.
Alright, yeah if they got 204" in there it probably is. I'll do up some pricing to ship the dozer, and the blade/c-frame on a 2nd trailer. Heading out a bit early today though (it's my birthday), I'll get a quote in tomorrow am. Nick
Good morning, they will take blade off at Richie bros at transport time.
Weight appears to be roughly 8500 lbs.
John Deere has 11'2" as c-frame width?
23'9" oal with ripper no blade.
Thanks
Sounds good, I'll update the width with the heavy haul team, and await their quote so I can submit it. Thanks, Nick
Quote submitted - includes the blade shipment, and all insurance, fuel surcharge, permits, and sales tax. Nick
Question: Hi, I’d be happy to handle your shipment with professional, insured, door-to-door service. Your equipment will be hauled on an RGN trailer with ramps. Our bid is all-inclusive, including required permits. Please confirm the dimensions, weight, pickup readiness, and loading/unloading assistance before accepting. Thank you!/ JEFFREY
please let me know if the blade will be removed
Blade will be removed during pickup and must be be transpotred with load.
Yes i will send you a RGN trailer and for the blade will hauled on flatbed
Yes i will send you a RGN trailer and for the blade will hauled on flatbed
ok perfect, the blade weight is 8500lbs
have you quoted?
I have a driver for pick up tomorrow, or monday my quote include permits, i have a RGN and flatbed ready pick up both same day, beacuse is not legal transport in one trailer on the RGN the blade
I have a driver for pick up tomorrow, or monday my quote include permits, i have a RGN and flatbed ready pick up both same day, beacuse is not legal transport in one trailer on the RGN the blade
Hi Jeffrey, it doesn't show any info stating what broker quotes relate to questions?
You can see on the notes my name Jeff, accept my bid, let's get it done Boss
You are ready to book ?
thanks, not quite yet. Getting a few service records before we committ and a few more bids to come in.
Ok, we can pick up monday morning
Hi boss are you still waiting for bids?
Hi i have another driver for pick up wednesday or friday, please let me know boss
My bid is all-inclusive, covering both trailers, required permits, and transportation from pickup to delivery. This is a specialized heavy-haul shipment, and I already have dedicated drivers and the proper equipment ready for Wednesday or Friday. Everything is lined up on our end, and we’re ready to proceed as soon as you accept my bid!
Question: Our traspotation quote includes 2 trailers one for the main unit and a HS for the blade
Place Bid
Time Left: 11 Days 6 Hours
Bid Amount
